MarineLink.com - latest marine news  
March 22, 2010         






 

StatoilHydro Developments Paying Off

Tuesday, October 20, 2009
StatoilHydro Developments Paying Off
Better drilling methods are making the single biggest contribution to improving recovery from Norway’s offshore fields. A number of solutions adopted by StatoilHydro this year are already yielding good results.

“Downhole intervention and sidetracks from existing wells are the most effective ways of recovering more oil and gas from subsea fields,” said head of subsea technology, Øystein A. Håland. “Adopting new solutions in these areas also yields substantial reductions in operating costs.”

A growing number of discoveries on the Norwegian continental shelf are being developed with subsea installations. At the same time, production is declining from mature fields. Wells need workovers to maintain their output by removing deposits and halting water intrusion. But conventional jobs of this kind have been expensive on subsea developments.

StatoilHydro has now adopted light well intervention (LWI) vessels on a large scale, with two such ships in operation all year round on the NCS.

Compared with the use of traditional drilling rigs, these units cut the cost of well intervention work for the group by 50-70%.
 
Wireline
During LWI, downhole equipment is remotely operated via a wireline from the surface and – unlike rigs – without a riser. A monohull is also much faster to redeploy than a moored semi-submersible.

“We’ve conducted about 90 LWI operations since starting with these,” reported Øyvin Jensen, head of this activity at StatoilHydro. “They’ve all been successful and have shown good results for health, safety and the environment.”

StatoilHydro has been pursuing riserless wirelining on subsea wells since 2003, with the technology being steadily improved.

“We expect LWI to earn us about NOK 15 billion in 2009,” said Jensen. The group operates some 500 subsea wells on the NCS, which account for more than 40% of its oil and gas production.

Earlier this autumn, StatoilHydro reported a successful first use of through tubing rotary drilling (TTRD) for a sidetrack drilled directly out from the production tubing in an existing well. The company is now in the market to acquire a rig purpose-built for such operations, and hopes to have this new unit in place by 2012-13.

“Our ambition is that this technology will allow us to cut costs for such well interventions by 40%,” said Håland.
 

Related Strories
Central GOM Lease Sale 213 Results
Topaz Announces $65M Profit for 2009
Statoil Initial Public Offering
Bids Received, Central GOM Lease Sale
Statoil Fast Tracks Projects
 
 
 
FREE Marine Magazines Subscription
 

Central GOM Lease Sale 213 Results Mar 19 2010 12:29AM

EU NAVFOR Transfers Suspected Pirates Mar 19 2010 12:29AM

Ireland to Modernize Maritime Administration Mar 19 2010 12:28AM

Pirates Attack EU NAVFOR Warship Mar 19 2010 12:28AM

OSX Brasil Slashes Public Offering Mar 19 2010 12:27AM

Wärtsilä Selected Best Supplier by CNOOC Mar 19 2010 12:26AM

T&T Bisso Refloats Sunken Tug Mar 19 2010 12:25AM

Viking Prospers Despite Tough Conditions Mar 19 2010 12:25AM

Brunswick Introduces Largest Justice Model Mar 19 2010 12:24AM

Port Dolphin Energy, Port Manatee $30M Deal Mar 19 2010 12:23AM

Kvichak Delivers Debris Removal Vessel Mar 19 2010 12:22AM

Titan Completes Crane Removal, Port-au-Prince Mar 19 2010 12:21AM

This Day in Coast Guard History – March 19 Mar 19 2010 12:18AM

This Day in Naval History – March 19 Mar 19 2010 12:17AM

Topaz Announces $65M Profit for 2009 Mar 18 2010 1:54AM

Rolls-Royce Promas Lite for Carnival Glory Mar 18 2010 1:53AM

Bourbon 2009 Financial Results Mar 18 2010 1:51AM

MMWC Propeller Arresters Mar 18 2010 1:46AM

Bourbon 2009 Financial Results Mar 18 2010 1:44AM

Record-Breaking Profits for Rafael in 2009 Mar 18 2010 1:39AM

© 1996-2010 Maritime Activity Reports, Inc.
Developer: Vladimir Bibik